Monday, May 11, 2009

Sidewalk construction underway at Greenville Post Office

A major sidewalk renovation is underway at the Greenville Post Office. If you tried to use the drive-through boxes today, you were out of luck. As you can see from the pictures below, the drive-through was blocked off with cones - and several parking spaces were inaccessible as well. Overflow customers were parking in the Colony parking lot over the lunch hour.

A postal employee indicated that the work was limited to sidewalk repair. The drive-through is expected to be unavailable for about three weeks.


No comments:

Post a Comment

Featured Posts

/* Track outbound links in Google Analytics */